Compute availability, performance and quality separately, multiply them, and convert each loss back into minutes.

Run time (minutes)
422.0
Availability
87.9%
Performance
88.2%
Quality
96%
Overall equipment effectiveness
74.4%
Good units
1786
Fully productive minutes
357.2
Minutes lost to availability
58.0
Minutes lost to performance
50.0
Minutes lost to quality
14.8
Weakest factor
availability

Methodology

Overall equipment effectiveness multiplies three independently measured factors, each expressed against planned production time. Availability = run time ÷ planned production time, where run time is planned time minus all downtime, planned or not. Performance = (ideal cycle time × total units produced) ÷ run time — the share of running time spent producing at the rate the equipment is capable of, which is where small stops and reduced speed appear. Quality = good units ÷ total units produced, counting a unit as good only if it needed no rework. The three are multiplied rather than averaged, which is why three individually respectable factors produce a much lower combined figure. Each factor's loss is also converted back into minutes so the three are directly comparable in the same unit, and the weakest factor is named rather than left to inspection. Excluded: planned non-production time is outside the calculation by definition, so a plant that runs few shifts can report a high figure; changeover treatment varies between plants and is whatever you classified it as here; and this says nothing about whether the equipment should be run harder at all. A figure is only comparable with itself over time on the same equipment and the same definitions — never between plants, and never against a published target. You supply every input: this site holds no factory cost data, capacity figures, yields, cycle times or industry benchmarks, and never estimates them for you. Results are an orientation model for structuring a decision, not an industrial engineering study, a quotation, or safety, engineering or financial advice. Confirm equipment capability, staffing, process capability and cost with your own measurements before relying on them.

These calculations are informational estimates based on headline rates and transparent assumptions — not tax, accounting, or legal advice. Verify with a qualified local advisor before relying on the results.

Data limitations

  • Manufacturing figures are operator-supplied inputs, not market data. GeoBusinessIQ holds no factory costs, production volumes, yields, cycle times, tooling prices or capacity data and does not estimate them — every result reflects only the figures you enter.