Available minutes per day
830.0
Takt time (seconds)
103.75
Takt time (minutes)
1.73
Required units per hour
34.70
Cycle time as share of takt
101.2%
Spare seconds per unit
-1.25
Shortfall units per day
6
Pace against takt
behind takt
  • Cycle time exceeds takt: the line cannot meet demand in the available time as configured.

Methodology

Available minutes per day = shifts × (hours per shift × sixty minutes − breaks − planned stoppages). Takt time = available minutes per day ÷ customer demand per day, expressed in seconds. It is the rhythm demand sets, not a measurement of the line. Cycle-to-takt ratio = current cycle time ÷ takt time. Below takt the line can meet demand within planned hours; above it, demand cannot be met without more time, more capacity, or less work content per unit. Spare seconds per unit is takt minus cycle time, which is the buffer a station has before a small disturbance turns into a late order. Shortfall units per day converts an over-takt cycle time into the units the day would end short, assuming the line runs the whole available time. Excluded: scrap and rework (a line running at takt but scrapping output does not ship at takt), unplanned downtime, changeovers between products, mix effects, and any station-level imbalance — takt is a single number for a whole line. You supply every input: this site holds no factory cost data, capacity figures, yields, cycle times or industry benchmarks, and never estimates them for you. Results are an orientation model for structuring a decision, not an industrial engineering study, a quotation, or safety, engineering or financial advice. Confirm equipment capability, staffing, process capability and cost with your own measurements before relying on them.

These calculations are informational estimates based on headline rates and transparent assumptions — not tax, accounting, or legal advice. Verify with a qualified local advisor before relying on the results.

Data limitations

  • Manufacturing figures are operator-supplied inputs, not market data. GeoBusinessIQ holds no factory costs, production volumes, yields, cycle times, tooling prices or capacity data and does not estimate them — every result reflects only the figures you enter.