GeoBusinessIQGeoBusinessIQ

Throughput calculator

Find the constraint in a multi-station line, quantify balance loss, and see how far it can be lifted before the limit moves.

Stations on the line
Bottleneck station
Welding
Bottleneck rate (units/hour)
72.00
Line throughput per period
11520
Fastest station rate (units/hour)
120.00
Balance loss
40%
Starved capacity per period
7680
Flow time (hours)
6.25
Next constraint
Finishing
Headroom to next constraint
22.2%

Methodology

A line runs no faster than its slowest station, so line throughput per hour equals the lowest station rate you enter and throughput per period multiplies that by the available hours. Balance loss = one minus bottleneck rate ÷ fastest station rate: the share of the fastest station's capability the line cannot use because something upstream or downstream cannot keep up. Starved capacity converts that loss into units per period, which is what the line would have produced had every station matched the fastest one. Flow time uses Little's law — work in progress ÷ throughput rate — to show how long a unit spends in the system at the current level of work in progress. Headroom to the second bottleneck shows how much the constraint can be lifted before a different station becomes the limit, which is the practical ceiling on any single improvement. Excluded: scrap and rework, variability and queueing (Little's law gives an average, not a distribution), setup and changeover, batch transfer effects, shared resources across lines, and buffer sizing. You supply every input: this site holds no factory cost data, capacity figures, yields, cycle times or industry benchmarks, and never estimates them for you. Results are an orientation model for structuring a decision, not an industrial engineering study, a quotation, or safety, engineering or financial advice. Confirm equipment capability, staffing, process capability and cost with your own measurements before relying on them.

These calculations are informational estimates based on headline rates and transparent assumptions — not tax, accounting, or legal advice. Verify with a qualified local advisor before relying on the results.

Data limitations

  • Manufacturing figures are operator-supplied inputs, not market data. GeoBusinessIQ holds no factory costs, production volumes, yields, cycle times, tooling prices or capacity data and does not estimate them — every result reflects only the figures you enter.